← All scores

Methodology 1.2

How the Veridio Score works

One 0–100 number per project, fully itemised: 8 independent factors, each with its own evidence, combined by fixed weights. The numbers on this page are read live from the scoring code, so they cannot drift from what we actually run.

Factors, weights and where the data comes from

Scroll sideways to see every column →

FactorLand useOther typesData source
Methodology quality 15% 20% CCQI pillar scores (the weakest pillar counts double) and the ICVCM Core Carbon Principles decision on the methodology.
Project documents 20% 20% Veridio's deterministic 0-100 document score over the project's own PDFs (design documents, monitoring, validation and verification reports), adjusted by the due-diligence read: -25 when the documents undermine the claims, +5 when they support them.
Certification & standard 6% 15% ICVCM programme status, CORSIA eligibility and the project's registry status.
Country governance 10% 10% World Bank Worldwide Governance Indicators: rule of law, control of corruption, government effectiveness, political stability.
Delivery track record 4% 10% Registry issuance and retirement records: volume issued, share retired, how recently the project issued.
Over-crediting evidence 20% 10% Published project-level achievement ratios (share of claimed reductions found real) and documented controversies; without a study, Veridio's biomass cross-check of credits issued per hectare.
Satellite record
land-use projects only
18% n/a Veridio's remote-sensing verdict for the site (land-use projects only). Verdicts from a map pin rather than a real boundary are damped.
Natural hazards
land-use projects only
7% n/a Measured exposure of the site to fire, drought (public drought index), flood, cyclones and deforestation pressure around it (land-use projects only). The worst hazard sets the factor score.
Total100%85% → renormalisedFor non-land projects the satellite and hazard weights do not apply; the rest is rescaled to 100.

Each factor score maps to a five-step risk scale, the inverse of the score: 85+ very low · 70+ low · 50+ medium · 30+ high · below 30 very high risk.

Missing data, coverage and confidence

Missing data is never scored as zero or as average. A factor without data is left out and the remaining weights are renormalised. Coverage is the share of the applicable weight that is backed by real data — for a cookstove or wind project the satellite and hazard factors do not apply and are not counted against it.

Scroll sideways to see every column →

CoverageConfidenceWhat we publishProjects today
75% or moreHighHeadline score78
50–75%MediumHeadline score2,865
40–50%LowHeadline score, flagged3,164
below 40%InsufficientNo headline score; factors still shown7,153

Hard rule: a project that fails one of our reject rules (grade REJECTED) is capped at 35, whatever its factors say. The A–AAA grade remains the sell / don't-sell gate; the score is the continuous, explainable layer beside it.

Document score

We download each project's own PDFs — design documents, monitoring and annual reports, validation and verification reports, non-permanence risk reports — and score them deterministically on five components of 20 points each: completeness, verification, quantification, permanence and integrity. Every point is a text match stored with its snippet, so each score can be traced to a quote.

Limits. Text analysis measures what is documented, not whether it is true. Document discovery currently covers Verra and Acorn only.

Satellite record

Every site page says which rung of the boundary ladder its geometry stands on: 1 the project's own boundary file from its registry (for example Gold Standard GIS files), 2 the open project-boundary database (Karnik et al. 2024), 3 coordinates listed in the project's documents (an approximation), or 4 the registry's map pin plus a 5–15 km window sized from the reported hectares. Rungs 1–2 are real boundaries (medium confidence); 3–4 are approximations (low confidence). The control is a ring from 1.3× to 2.0× the site radius. For each sensor we take site minus control per year and compare the mean before and after the project start (difference-in-differences). A signal only counts when it exceeds the larger of a fixed floor and twice the pre-project noise.

Scroll sideways to see every column →

SensorProductUse
MODISMOD13Q1 NDVI, 250 m, 4 composites a year, 2012 onwardsLong pre-project baseline
Sentinel-2L2A 10 m, 2 clearest scenes a year, 2017 onwardsSharper, shorter baseline
Land coverImpact Observatory annual 10 m, 2017–2023Tree-cover %, corroborates only

Verdicts: ▲ supports and ▼ contradicts need a vegetation signal; land cover alone never decides. ● neutral means nothing distinguishable from the surroundings. All imagery comes from Microsoft Planetary Computer.

Soil-carbon and grazing claims get no satellite verdict: greenness from orbit cannot test them, so for those projects the factor stays empty rather than guessing.

Limits. Pin sites are always low confidence: a landscape window dilutes scattered smallholder plots, and young agroforestry needs 3–5 years to show at these resolutions — neutral on a young pin site is the expected outcome, not a red flag. Low-confidence verdicts are damped to 35% of their effect on the score. The start year defaults to 2021 (flagged “assumed”) until confirmed. The control ring may itself contain project plots, which biases toward neutral.

Natural hazards

Five hazards, all measured from open data, none modelled. The worst one sets the factor score: a fire-prone site is not made safe by being flood-proof.

HazardMeasureSource
Fireshare of the site burned per year, last five full yearsNASA MODIS MCD64A1 burned area, 500 m
Droughtshare of the last ten years' months in severe or extreme drought (Palmer Drought Severity Index ≤ −3), compared with the decade before; levels: under 1 / 1–2 / 2–3.5 / 3.5–5 / 5+ years of the decade. The site's own vegetation record corroboratesTerraClimate PDSI, ~4 km, monthly (Abatzoglou et al. 2018)
Floodshare of the site that was open water sometimes but not permanently, 1984–2020JRC Global Surface Water, 30 m
Cyclonehurricane-strength storms passing within 100 km, per decade, last 30 seasonsNOAA IBTrACS best tracks
Deforestation pressuretree cover lost per year in the landscape around the siteImpact Observatory land cover, 10 m

Limits. Past exposure is not a forecast. Drought is read at the site centre on a ~4 km grid; PDSI rises with warming-driven evaporative demand, so recent decades read drier than the past in many regions. Hazards on an approximate site describe the area, not the plots.

How the weights are set — and how much they matter

The score aggregates evidence; it is not fitted to an outcome and does not predict over-crediting (see the backtest below). Weights are set in advance by a rubric: independent, project-specific evidence weighs most; developer-authored or type-level evidence less. They change only with a new methodology version, by declared rules: towards external ratings only once 25 projects are paired (today: 1), and away from any factor that ranks documented over-crediting cases above their peers. They are never searched to maximise separation.

FactorIndependent of the developer?About this project?Why this weight
Methodologyyes — CCQI, ICVCMno — project typea sound method is necessary but says nothing about execution
Documentsno — the developer's own PDFs, scored by usyesthe only project-specific evidence for most projects; shows what is documented, not truth
Certificationpartly — registry and programme recordpartlyon land projects it ranked documented over-crediters above their peers, so it weighs less there
Countryyes — World Bankno — nationalgovernance context for permanence and enforcement
Deliveryregistry recordyesmeasures execution, not integrity; pointed the wrong way on land projects
Over-creditingyes — peer-reviewed studies, biomass cross-checkyesthe strongest evidence where it exists
Satelliteyes — measuredyesthe only independent measurement of a land claim
Hazardsyes — measuredyes — the siteexposure to future reversal, not past integrity

Sensitivity. Every rated project is re-scored under each alternative below with the live formula; the published set is held fixed. Spearman = rank agreement with today's weights; band flips = share of projects whose score crosses one of the 85 / 70 / 50 / 30 lines.

Scroll sideways to see every column →

ScenarioRank agreementMedian shift90th pct shiftBand flipsTop 10% kept
v1.0 weights0.9980.00.0 0.4%99.7%
equal weights0.9890.45.3 10.8% (above the flag threshold)▲85.2%
no self-reported factors0.9280.99.5 18.0% (above the flag threshold)▲61.9%
methodology ×0.50.9990.00.0 0.6%91.6%
methodology ×1.50.9990.00.0 1.0%94.7%
without methodology0.9960.00.0 1.5%89.0%
documents ×0.51.0000.00.0 0.0%99.4%
documents ×1.51.0000.00.0 0.1%99.7%
without documents0.9990.00.0 0.2%98.4%
certification ×0.50.9680.98.4 16.0% (above the flag threshold)▲72.0%
certification ×1.50.9830.45.5 9.8%84.7%
without certification0.8193.623.1 43.3% (above the flag threshold)▲33.0%
country ×0.50.9900.54.4 14.4% (above the flag threshold)▲86.5%
country ×1.50.9950.43.3 3.8%89.6%
without country0.9661.110.6 25.6% (above the flag threshold)▲72.0%
delivery ×0.50.9820.44.0 6.1%83.0%
delivery ×1.50.9940.33.0 8.7%93.0%
without delivery0.9290.89.5 18.1% (above the flag threshold)▲62.1%
over-crediting ×0.51.0000.00.0 0.0%100.0%
over-crediting ×1.51.0000.00.0 0.1%99.8%
without over-crediting0.9990.00.0 0.1%100.0%
satellite ×0.50.9990.00.0 0.2%99.7%
satellite ×1.50.9990.00.0 0.2%99.7%
without satellite0.9970.00.0 0.5%99.7%
hazards ×0.51.0000.00.0 0.1%99.8%
hazards ×1.50.9990.00.0 0.0%100.0%
without hazards0.9990.00.0 0.3%99.7%

Weight-sensitive factors (a ±50% change moves more than 10% of projects across a band): certification, country. They are present for almost every project and often among only two or three measured factors, so a low-coverage score is a coarse screen.

Minimum coverage to publish a scoreProjects with a headline score
30%6,684
35%6,666
40% (live)6,283
45%2,959
50%2,925
60%2,721

Many published scores sit just above the 40% gate — filter on confidence, not only on the score.

Generated 2026-10-10 under methodology 1.2 over 12,954 rated projects.

Backtest

Blind auc0.602
Verdictweak
Published auc0.829
Blind auc with satellite0.477

Backtest run 2026-10-10T14:23:24Z.

Data sources and licences

What each layer is built from, on what terms, and how we use it — one table for every source, with the attribution each licence asks for: Data sources and licences. Registry data stays with the registries: we show identifying facts and link to the registry page; scores, grades and indicative prices are our own.

Methodology version 1.2. Scorecards and API responses carry the version they were produced under.

Use it

Every rating page has a printable scorecard (print it or save it as PDF from your browser) and the same data as JSON. Need the scores in bulk? Ask us.

The Veridio Score is Veridio's independent opinion based on public data. It is not investment advice.